β± 22:40
π 9,540
π§ Wally Assembly Guide β From Parts to Robot
βΆοΈ Video Playback Area
Full Wally Assembly
π¦ Unboxing Checklist
- Main board Γ 1 + USB cable
- DC gear motors Γ 2 + track wheels
- Ultrasonic / infrared / grayscale sensors Γ 1 each
- Servo Γ 2 + LED strip Γ 1
- Buzzer Γ 1 + building-board pack
- Screws / nuts / washers pack + DuPont wires
- Battery box (AA Γ 4) Γ 1
ποΈ Assembly Steps
| Step | Content | Time |
|---|---|---|
| Chassis | Frame structure assembly | 20 min |
| Motor install | Motor + track | 15 min |
| Main-board wiring | Fix board + connect wires | 25 min |
| Sensor layout | Install & position sensors | 20 min |
| Appearance | LED layout + decoration | 15 min |
| Power-on debug | Test + upload program | 10 min |
β‘ Key Wiring
- Motor wires to M1 / M2 (watch polarity)
- Ultrasonic Trig β D2, Echo β D3
- Infrared obstacle: VCC-GND-OUT three-wire
- LED strip DIN to PWM pin D5 / D6
"The assembly process itself is the best learning. Children naturally grasp engineering concepts like structure, circuits, and mechanical transmission."
Share to:
β Back to News